Through this service, you can obtain approval to create a new sewage connection point for the plot that does not have a sewage connection point to serve it, subject to the availability of a sewage network in the area.
Service Channels | Service Time | Period | Fees | Customer Type |
---|---|---|---|---|
TAMM Platform | 7/24 | 40 working days | N/A |
|
• New Final Site Plan for the plot from the Municipality for no more than 6 months.
• Approved Sewerage Drawing from TAQA-WS (only in Al Ain City).
• Basement extension Drawing from municipality for commercial plots.
• Drawing showing the new port or backdrop location/ new manhole location on the existing sewerage line stamped by the assigned Contractor (if any).
• Method of statement with cross section drawing stamped by the assigned Contractor (if any).
• Login through TAMM Platform.
• Fill required information and Upload required documents and submit the request.
• Receive an approval for creation of a new sewerage connection point or rejection with comment electronically.