Request for Sewerage Connection Point Details
Service Description

Through this service, you can obtain approval from the SWS to create a new sewage connection point or a new sewage connection port for the plot that does not have a sewage connection point to serve it with the availability of a sewage network in the area.

Service Channels Service Time Period Fees Customer Type
SWS Clearance Management Application System (CMA) 7/24 23 working days N/A
  • • Individual
  • • Business
  • • Government

 

• New Final Site Plan for the plot from the Municipality for no more than 6 months.
• Approved Sewerage Drawing from ADSSC (only in Al Ain City).
• Basement extension Drawing from the municipality for commercial plots.
• Drawing showing the new port or backdrop location/ new manhole location on the existing sewerage line stamped by the assigned. Contractor. (if any).
• Method of statement with cross-section drawing stamped by the assigned Contractor (if any).

• Submit the application with the required documents through the available channels.
• Receive approval or rejection notice with comments electronically.